• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA PEBRERO 18, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer No. 2 sa Dingle Substation sa PEBRERO 18, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod:PEBRERO 18, 2023 (SABADO)6:00 AM- 6:00 PM (12… Read more

  • SCHEDULED POWER INTERRUPTION SA PEBRERO 1-5, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang CONCEPCION amo ang masunod: PETSA KAG ORAS KAG APEKTADO NGA LUGAR PEBRERO 01, 2023 (MIYERKULES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)•… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 27, 2023)

    Date: January 27, 2023 Time of interruption: 10:35 AM Time of restoration: 11:50 AM Affected area: Sitio Bungsod, Badiang, Anilao, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • Ano ang Manual Load Dropping ukon MLD?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar… Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more