• UNSCHEDULED POWER INTERRUPTION

    Date: September 21, 2024 (Saturday) Time of interruption: 6:35 AM Time of restoration: 7:56 AM Affected area: Municipality of Carles Cause: Damage of Pole Number 73 on its Pin Insulator Activity: Pole to Pole Inspection and replaced damage pin insulator For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG CONCEPCION SA OKTUBRE 1, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 01, 2024 (MARTES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing of lines. Ang lugar nga apektado sang sini nga power interruption sa banwa sang CONCEPCION amo ang: • Sitio Punta Luis, Poblacion Madamo gid Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG SARA SA SETYEMBRE 23, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa SETYEMBRE 23, 2024 (LUNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing of lines. Ang lugar nga apektado sang sini nga power interruption sa banwa sang SARA amo ang: • Batitao Madamo gid nga salamat sa Read more

  • Ano ang Manual Load Dropping ukon MLD?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more