• Unscheduled Power Interruption

    Date: October 14, 2024 (Monday) Time of interruption: 6:56 PM Time of restoration: 7:17 PM Affected area: Sara Substation Feeder 4 Whole municipality of Lemery Portion of Sara Cause of power interruption: Damaged cut-out at Brgy. Arante, Sara, Iloilo For your information. Read more

  • EMERGENCY POWER INTERRUPTION

    Date: October 14, 2024 (Monday) Time of interruption: 12:00 NN Estimated time to be restored: 1:00 PM Duration: 1 hour Affected areas: Whole Municipality of San Dionisio Sara (Anoring, Devera, Aldeguer & Castor) Aglosong, Concepcion Cause of interruption: Replacement of damaged steel pole hit by a vehicle at Brgy. Anoring, Sara For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG LEMERY, SAN DIONISIO, SARA KAG CONCEPCION SA OKTUBRE 12, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa OKTUBRE 12, 2024 (SABADO), 5:00 AM- 6:00 PM (13 ka oras ang kalawigon) para sa patigayunon nga preventive maintenance sang Sara Substation, pag-ilis sang poste kag steel pins kag clearing sang linya. Ang lugar nga apektado sang sini nga power interruption amo Read more

  • Ano ang Manual Load Dropping ukon MLD?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more