• SCHEDULED POWER INTERRUPTION SA BANWA SANG AJUY SA ABRIL 09, 2025

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa ABRIL 09, 2025 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruption sa banwa sang AJUY amo ang mga masunod: • San Antonio (portion) • Badiangan… Read more

  • RE-SCHEDULED POWER INTERRUPTION SA BANWA SANG ESTANCIA SA ABRIL 8, 2025

    Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED POWER INTERRUPTION sang ILECO III sa ABRIL 04, 2025 (BIYERNES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) ang gin RE-SCHEDULE sa ABRIL 08, 2025 (MARTES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag clearing sang linya. Ang lugar nga apektado sang sini… Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION

    Date: March 30, 2025 (Sunday) Time of interruption: 6:54 AM ESTIMATED Time of power restoration: 7:07 AM Affected areas: SARA LEMERY AJUY SAN DIONISIO CONCEPCION ESTANCIA BATAD CARLES BALASAN Cause of interruption: Faulty Phase Bravo Neutral For your information. Read more

  • Ano ang Manual Load Dropping ukon MLD?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar… Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more