• SCHEDULED POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga clearing activities. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang ESTANCIA amo ang mga masunod: MAY 29, 2025 (HUWEBES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) MAY 30, 2025 (BIYERNES)… Read more

  • SCHEDULED POWER INTERRUPTION

    MAY 25, 2025 (DOMINGO) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) MAY 26, 2025 (MONDAY) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) MAY 27, 2025 (MARTES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) MAY 28, 2025 (MIYERKULES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) MAY 30, 2025… Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED POWER INTERRUPTION sang ILECO III sa MAYO 24, 2025 (SABADO), 6:00 AM- 4:00 PM (10 ka oras ang kalawigon) para sa pag-clearing sang linya, pag-ilis sang poste kag steel pins kag iban pa nga technical activities. Ang mga lugar nga apektado sang sini nga KANSELADO nga power… Read more

  • Ano ang Manual Load Dropping ukon MLD?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar… Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more