• RESCHEDULED POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED POWER INTERRUPTION sang ILECO III sa MAYO 29, 2024 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) ang GIN-RESCHEDULE sa HUNYO 04, 2024 (MARTES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga clearing activities. Ang lugar nga apektado sang sini nga Read more

  • EMERGENCY POWER INTERRUPTION

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III subong nga adlaw MAYO 27, 2024 (LUNES), 10:00 AM- 3:00 PM (5 ka oras ang kalawigon) para sa pag-ilis sang mga pin insulator kag pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BALASAN amo ang: • Read more

  • NGCP UNSCHEDULED POWER INTERRUPTION

    What: NGCP UNSCHEDULED POWER INTERRUPTION Time of Power Interruption: 11:34 AM Time Restored: Ajuy S/s – 11:52AM Balasan S/s – 11:52 AM Sara S/s – 11:50 AM Daan Banwa S/s – 11:52 AM Affected Areas: Municipalities of Ajuy, Lemery, Sara, San Dionisio, Concepcion, Batad, Estancia, Balasan, and Carles Please keep posted for further updates. Thank Read more

  • Ano ang Manual Load Dropping ukon MLD?

    Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar Read more

  • ENERGY CONSERVATION TIPS!

    REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save Read more

  • ILECO III CONTACT INFORMATION

    Read more

  • FOLLOW AND LIKE THE ILECO III OFFICIAL FB PAGE

    Please follow and like the official Facebook page of ILECO III to know the latest power advisories, coop activities and other concerns related to electric service. Thank you! Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more