
POWER RATES
POWER ADVISORIES
*Update on NGCP’s scheduled power interruption Power has been restored in Natividad Area Coverage Time of power restoration:Natividad Area Coverage: 6:06 PM We apologize for the inconvenience. Thank you for your understanding. Read more
ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more
*Update on NGCP’s unscheduled power interruption Power has been restored to all affected areas in our coverage. Time of power restoration as follows:Natividad Area Coverage: 3:13 a.m.Sara Area Coverage: 3:17 a.m.Panian Area Coverage: 3:17 a.m We apologize for the inconvenience. Thank you for your understanding. Read more
NEWS AND UPDATES
1. Magtawag ukon mag-text.ILECO III Contact Numbers:SARA AREA OFFICE – 0919-069-7391NATIVIDAD AREA OFFICE – 0919-069-7403PANI-AN AREA OFFICE – 0919-069-7396Kalakip ang mga masunod nga impormasyon:PANGALAN kag ADDRESS 2. Magpadala sang mensahe sa ILECO III Facebook Page.Kalakip ang mga masunod nga impormasyon:PANGALANADDRESSCONTACT NUMBER 3. Magbisita sa Area Office.ILECO III OFFICE HOURS:LUNES- BIYERNES8:00 AM- 5:00 PM12:00 NN- LUNCHBREAK… Read more
Ini ang proseso nga kung sa diin gina-buhinan ang power load sa grid bangud sa kakulangan sang supply sang kuryente nga masami matabo kung may mga naguba nga planta kadungan sang pag-taas sang supply sang pag-gamit sang kuryente. Bangud diri, ginapatigayon ang MLD pina-agi sa “rotational brownout” sa nagaka-igo nga oras sa nasakupan nga lugar… Read more
REFRIGERATOR Repair refrigerator door seals if you feel cold air around the closed door or if moisture is collecting.Clean the condenser tube regularly.Minimize door openings as much as possible. Cool air escapes every time the refrigerator is opened.Buy ref with Energy Efficient Factor and preferably one with an inventer technology.Replaced old refrigerators.Reference:100 ways to save… Read more
BIDS AND NOTICES
Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more