• UPDATE

    Power restored at 1:36 PM. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 16, 2023)

    Date: January 16, 2023 (Monday) Time of power interruption: 5:30 AM Time of restoration: Not yet determined Affected areas: Devera, Posadas, Aldeguer and Castor, Sara, Iloilo and Whole Municipality of San DionisioReason: Toppled pole in Brgy. Devera, Sara, Iloilo Our maintenance team is currently checking the lines for power restoration. We apologize for the inconvenience.… Read more

  • INSERTING OF 30 FOOTER STEEL POLE IN BRGY. ALEMAÑA, LEMERY

    LOOK: ILECO III personnel conducted inserting of 30 footer steel pole due sagging of secondary and neutral line at Almeñana, Lemery, Iloilo today, January 13, 2023. (No Power Interruption Occurred) For your information. Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more