• EMERGENCY POWER INTERRUPTION

    Date: August 02, 2024 (Friday) Time of power interruption: 5:00 AM Estimated time of power restoration: 5:30 AM Duration: 30 minutes Affected areas: Daan Banwa Feeder 3 Municipality of Batad Alapasco, Alinsolong, Banban, Batad Viejo, Binon-an, Bolhog, Bulak Norte, Bulak Sur, Cabagohan, Calangag, Caw-i, Drancalan, Embarcadero, Hamod, Malico, Nangka, Pasayan, Poblacion, Quiazan Florete, Quiazan Lopez, Read more

  • EMERGENCY POWER INTERRUPTION

    Date: August 02, 2024 (Friday) Time of power interruption: 5:00 AM Estimated time of power restoration: 5:30 AM Duration: 30 minutes Affected areas: Daan Banwa Feeder 3 Municipality of Batad Alapasco, Alinsolong, Banban, Batad Viejo, Binon-an, Bolhog, Bulak Norte, Bulak Sur, Cabagohan, Calangag, Caw-i, Drancalan, Embarcadero, Hamod, Malico, Nangka, Pasayan, Poblacion, Quiazan Florete, Quiazan Lopez, Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BALASAN SA AGOSTO 2, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa AGOSTO 02, 2024 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruption sa banwa sang BALASAN amo ang: • Aranjuez • Bonifacio St., Poblacion Norte • Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more