• KANSELADO ANG SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA MARSO 26, 2023

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa MARSO 26, 2023 (DOMINGO), 6:00 AM- 6:00 PM (12 ka oras ang kalawigon). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: MARSO 26, 2023… Read more

  • EMERGENCY POWER INTERRUPTION (MARCH 23, 2023)

    Date: March 23, 2023 (Thursday)Time of interruption: 12:00 NNEstimated time of restoration: 1:00 PMDuration: 1 hour Affected areas: AJUY AND CONCEPCION Activity: Refilling of SF6 gas of power circuit breaker in Concepcion Switchyard We apologize for the inconvenience. For your information.  Read more

  • UNSCHEDULED POWER INTERRUPTION (MARCH 18, 2023)

    Date: March 18, 2023 (Saturday) Time of interruption: 6:40 P.M. Time of restoration: To be determined Affected area: Brgys. Bobon,Managopaya, and Juanico, Banate Reason: 3 toppled poles hit by backhoe in Brgy. Managopaya, Banate We apologize for the inconvenience. For your information Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more