• UNSCHEDULED POWER INTERRUPTION (OCTOBER 28, 2022)

    Date: October 28, 2022 Time of interruption: 6:13 PM Time of Restoration: 7:15 PM Affected Area: Balantian, Balasan Reason/Activity: Line fault due to heavy rain and lightning surge/ Inspection of line and replaced busted fuse link. We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 28, 2022)

    Date: October 28, 2022 Time of interruption: 5:24 PM Time of Restoration: 6:48 PM Affected Area: Lawis, Balasan Reason/Activity: Line fault due to secondary jumper cut-off/ Repair secondary jumper cut-off and re-fusing We apologize for the inconvenience. For your information. (Photo is pixelated and distorted due to heavy rain) Read more

  • REPAIR OF SECONDARY JUMPER OF TRANSFORMER LOOSE CONNECTION IN BOTONON, ESTANCIA

    ILECO III Technical personnel repaired the secondary jumper of the transformer loose connection at Brgy. Botongon, Estancia today, October 28, 2022 (Friday). Keep safe Warriors of Light For your information. Read more

  • NOTICE TO THE PUBLIC

    Ginapahanumdom ang tanan nga katapo-konsumidores nga sa mga hilikuton kaangay sang Battle of the Sounds, Barangay Fiesta kag pagpatigayon sang welding operations sa mga construction sang puluy-an, buluthu-an kag iban pa nga istruktura nga ginapanugyan gid nga magpatakod sang private ukon kaugalingon nga transformer base sa rekomendasyon sang aton kooperatiba. Ini sandig sa Coop Policy… Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more