• ILECO III POWER ADVISORY: NGCP UNSCHEDULED POWER INTERRUPTION

    Date: October 08, 2023 (Sunday)Time of interruption: 12:04 PMTime of restoration: Not yet determinedAffected areas:SaraLemeryAjuySan DionisioConcepcionEstanciaBatadBalasanCarles Cause of interruption: Under investigation We apologize for the inconvenience. For your information. Read more

  • ILECO III POWER ADVISORY: NGCP’s UNSCHEDULED POWER INTERRUPTION AS OF 12:20 PM

    DATE: OCTOBER 08, 2023 (SUNDAY)Time of interruption:Sara S/s -12:04 PMAjuy S/s – 12:01 PMPANI-AN S/s – 12:04 PMDAAN BANWA S/s – 12:04 PM Estimated Time of power restoration: SARA S/s – Not yet determinedAJUY S/s- Not yet determinedPANI-AN S/s – Not yet determinedDAAN BANWA S/s – Not yet determined Affected areas: Sara, Ajuy, Concepcion, Lemery,… Read more

  • ILECO III POWER ADVISORY: NGCP’s UNSCHEDULED POWER INTERRUPTION (AS OF 7:50 PM)

    DATE: OCTOBER 06, 2023 (FRIDAY)Time of interruption: 4:02 PMEstimated Time of power restoration: AJUY S/s – 5:06 PMSARA S/s – 5:06 PMPANI-AN S/s – 7:52 PMDAAN BANWA S/s – 7:46 PM Affected areas: SARA, LEMERY, SAN DIONISIO, AJUY, CONCEPCION, BATAD, BALASAN, ESTANCIA AND CARLES Cause of interruption: Toppled bamboo tree situated 8meters outside PLC between… Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more