• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 7:44 AM Estimated time of restoration: 8:50 AM Affected area/s: Brgy. Dapdapan and Cabantohan, Lemery Activity: Inspection/repaired sectionalizing cut-out of Phase C located at Brgy. Arante and replaced busted fuse link due to heavy rain and lightning surge We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 8, 2023)

    Date: November 8, 2023 (Wednesday) Time of interruption: 12:05 NN Estimated time of restoration: 1:27 PM Affected area/s: Brgy. Ferraris, Sara Activity: Inspection/repaired sectionalizing cut-out and replaced busted fuse link and fuse tube at Brgy. Ferraris, Sara due to Phase C trip-off. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 7, 2023)

    Date: November 7, 2023 (Tuesday) Time of interruption: 2:31 PM Estimated time of restoration: 3:03 PM Affected area/s: Sitio Pulacan West, Luca, Ajuy Activity: Inspection and replaced busted fuse link due to animal contact We apologize for the inconvenience. For your information. Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more