• THERMAL SCANNING OF DISTRIBUTION LINES

    ILECO III Technical Team conducted Thermal scanning of Distribution Lines to determine hotspots of distribution lines and to reduce system loss today, January 31, 2023 (Tuesday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 31, 2023)

    Date: January 31, 2023 Time of interruption: 11:30 AM Time of restoration: 3:25 PM Affected area: Trinidad Village, Poblacion, Barotac Viejo, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (ENERO 31, 2023)

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III subong nga adlaw, ENERO 31, 2023 (MARTES), 4:30 PM- 5:00 PM (tunga sa oras ang kalawigon) para sa pagkuha sang poste sang TELCO nga naga-tandog sa primary line sang ILECO III. Ini isa sa mga rason sang power interruptions nga nagaluntad sa aton… Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more