• SCHEDULED POWER INTERRUPTION SA BANWA SANG SAN DIONISIO, SARA KAG CONCEPCION SA HULYO 8, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-relocate sang mga poste nga apektado sang DPWH widening project sa Poblacion, Sara, pag-ilis sang mga guba nga poste kag pin insulators kag pag-construct sang Single Phase Line Structure. Ang petsa, oras kag lugar nga apektado sang sini nga power interruption… Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION

    DATE: July 05, 2023 (Wednesday) Time of interruption: 4:31 AMEstimated Time of power restoration on the ff. ILECO III S/s Barotac Viejo S/s: 9:35 AMBanate S/s: 9:36 AM Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Kindly report using our messenger on our Facebook Page or call the following contact details of our area… Read more

  • NGCP’s UNSCHEDULED POWER INTERRUPTION (JULY 5, 2023)

    DATE: July 05, 2023 (Wednesday) Time of interruption: 4:31 AM Estimated Time of power restoration: NOT YET DETERMINED Affected areas: Anilao, Banate, Barotac Viejo and San Rafael Cause of interruption: UNDER INVESTIGATION Our technical team is closely coordinating with NGCP for the power restoration. We apologize for the inconvenience. For your information.  Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more