• ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    *Update on NGCP’s scheduled power interruption Power has been restored in Natividad Area Coverage Time of power restoration:Natividad Area Coverage: 6:06 PM We apologize for the inconvenience. Thank you for your understanding. Read more

  • RECONNECTION OF PULL OUT KWHR METER AND REPLACED METER BASE LOOSE CONNECTION IN BATAD

    ILECO III Technical personnel conducted reconnection of pulled out kWhr Meter and replaced meter base loose connection at Brgy. Hall, Caw-I, Batad today, October 15, 2022 (Saturday). Keep safe Warriors of Light For your information. Read more

  • ILECO III POWER ADVISORY (OCTOBER 15, 2022)

    *Update on NGCP’s unscheduled power interruption Power has been restored to all affected areas in our coverage. Time of power restoration as follows:Natividad Area Coverage: 3:13 a.m.Sara Area Coverage: 3:17 a.m.Panian Area Coverage: 3:17 a.m We apologize for the inconvenience. Thank you for your understanding. Read more

  • NOTICE TO THE PUBLIC

    Ginapahanumdom ang tanan nga katapo-konsumidores nga sa mga hilikuton kaangay sang Battle of the Sounds, Barangay Fiesta kag pagpatigayon sang welding operations sa mga construction sang puluy-an, buluthu-an kag iban pa nga istruktura nga ginapanugyan gid nga magpatakod sang private ukon kaugalingon nga transformer base sa rekomendasyon sang aton kooperatiba. Ini sandig sa Coop Policy… Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more