• UNSCHEDULED POWER INTERRUPTION (JANUARY 18, 2023)

    Date: January 18, 2023 Time of interruption: 2:13 PM Time of restoration: 3:20 PM Affected areas: JM Basa St., Pase (portion) and Capinang, San Dionisio, Iloilo Activity: Construction/Insertion of 35 ft steel pole due to sagging three phase line We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 17, 2023)

    Date: January 17, 2023 Time of interruption: 11:05 AM Time of restoration: 1:30 PM Affected area: Brgy. San Salvador, Banate, Iloilo Activity: Replaced rusty steel poles We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 16, 2023)

    Date: January 16, 2023 (Monday )Time of interruption: 1:25 PM Time of restoration: 2:05 PM Affected area: Drancalan, Batad, Iloilo Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • NOTICE TO THE PUBLIC

    Ginapahanumdom ang tanan nga katapo-konsumidores nga sa mga hilikuton kaangay sang Battle of the Sounds, Barangay Fiesta kag pagpatigayon sang welding operations sa mga construction sang puluy-an, buluthu-an kag iban pa nga istruktura nga ginapanugyan gid nga magpatakod sang private ukon kaugalingon nga transformer base sa rekomendasyon sang aton kooperatiba. Ini sandig sa Coop Policy… Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more