• UNSCHEDULED POWER INTERRUPTION (JULY 27, 2023)

    Date: July 27, 2023 (Thursday) Time of interruption: 8:13 AM Time of restoration: 8:48 AM Affected area: Belen, Banate Action Taken: Inspection of lines and replaced busted fuse link. We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (JULY 27, 2023)

    Date: July 27, 2023 (Thursday) Time of interruption: 8:00 AM Estimated time of restoration: 3:00 PM Affected area: Sitio Agho and Sitio Katawon, Improgo, Sara Activity: Clearing of line due to vegetation that obstruct the primary section and neutral line that causes successive unscheduled power interruption in the said area. We apologize for the inconvenience.… Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 26, 2023)

    Date: July 26, 2023 (Wednesday) Time of interruption: 7:00 AM Time of restoration: 11:00 AM Affected area: Balabag, Anilao Action Taken: Inspection of lines and repair open secondary jumper We apologize for the inconvenience. For your information. Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more