• SUPPLEMENTAL POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ukon INDI MADAYON ang power interruption sa ENERO 27, 2024 (SABADO), 6:00 AM- 4:00 PM (10 ka oras ang kalawigon) para sa pag-clearing sang linya kag pag-ilis sang mga poste kag cross-arms. Ang lugar nga apektado sang sini nga power interruption amo ang masunod:• TANAN NGA BARANGAY SA ANILAO• Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 24, 2024)

    Date: January 24, 2024 Time of interruption: 10:45 AM Time of power restoration: 11:23 AM Affected areas: NHA Village Site 1, Nalumsan, Carles, Iloilo Activity: Repaired transformer supply and jumper loose connection For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 24, 2024)

    Date: January 24, 2024 Time of interruption: 6:43 AM Time of power restoration: 8:46 AM Affected areas: Bolo, Tupaz, Cabuguana, Bancal (portion), Poblacion, Carles, Iloilo Activity: Replaced damage assembly fuse cut-out in Balantian, Balasan For your information. Read more

  • ILECO III ELECTRICITY RATES

    PRESS RELEASE Pahibalo sa mga Katapu-Kunsomidores sang ILECO III nga nagnubo na sang masobra 2 pesos/kwhr ang presyo sang kuryente sang ILECO III halin Nobyembre 2022 – Enero 2023 NOBYEMBRE – 14.6963 pesos/kwhrDISYEMBRE – 13.5551 pesos/kwhrENERO – 12.6897 pesos/kwhr Read more

  • ILECO III ENERGY SAVING TIP

    Kuhaon sa saksakan ang mga appliances nga wala ginagamit. Read more

  • LIVE INTERVIEW WITH ILECO III MANAGEMENT COMMITTEE

    Please watch to know more about ILECO III’s operation and other activities https://www.facebook.com/ILECO3/posts/pfbid02aoBoNn7RMA2vxFyJkdfgsPkrH5aR4919Qp23Vi31HokegyARmzYrmHN4JWQ8NJeFl Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more