• NGCP’s UNSCHEDULED POWER INTERRUPTION (OCTOBER 10, 2022)

    DATE: October 10, 2022 (Monday)Time of interruption: 7:43 AMEstimated Time of power restoration: 7:50 AMAffected areas: Whole Coverage of Natividad Area (Anilao, Banate, Barotac Viejo and San Rafael)Cause of interruption: 69kV transmission line of NGCP. Not yet determined We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 6, 2022)

    Date: October 6, 2022Time of interruption: 8:15 PMTime of Restoration: 9:03 PMAffected Area: Punta, CarlesActivity: Inspection/clearing on the primary lines due to vegetation and replace fuselinkWe apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 6, 2022)

    Date: October 6, 2022 Time of interruption: 10:00 AM Time of Restoration: 12:15 PM Affected Area: Portion of Merced, Banate Activity: Fixing the sagging of the secondary line and clearing of lines affecting the two (2) span distribution pole due to vegetation We apologize for the inconvenience. For your information. Read more

  • ILECO III personnel conducted BAPA Meeting in Vista Alegre, Barotac Viejo, Iloilo with 95 attendees on January 27, 2023 (Friday)

    This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs).For your information. Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • REQUIREMENTS FOR CHANGE OF NAME (DECEASED MEMBER CONSUMER)

    1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after on the… Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT(REPUBLIC ACT 11361)

    ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution lines. 2. Pagpatindog… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more