• REPLACEMENT OF 2 BURNED KWHR METER IN PUROK 2, PANTALAN, CARLES

    ILECO III Technical personnel conducted replacement of Two (2) burned kWhr Meter at Purok 2, Pantalan, Carles today, October 11, 2022 (Tuesday). Keep safe Warriors of Light For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 11, 2022)

    Date: October 11, 2022 Time of interruption: 1:30 AM Time of Restoration: 9:10 AM Affected Area: Sambulawan Island, Carles Reason/Activity: Transient line fault. Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 11, 2022)

    Date: October 11, 2022 Time of interruption: 1:46 PM Time of Restoration: 2:16 PM Affected Area: Public Market, Poblacion, Estancia Activity: Repair secondary bushing loose connection We apologize for the inconvenience. For your information. Read more

  • ILECO III personnel conducted BAPA Meeting in Vista Alegre, Barotac Viejo, Iloilo with 95 attendees on January 27, 2023 (Friday)

    This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs).For your information. Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • REQUIREMENTS FOR CHANGE OF NAME (DECEASED MEMBER CONSUMER)

    1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after on the… Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT(REPUBLIC ACT 11361)

    ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution lines. 2. Pagpatindog… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more