• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA PEBRERO 18, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer No. 2 sa Dingle Substation sa PEBRERO 18, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod:PEBRERO 18, 2023 (SABADO)6:00 AM- 6:00 PM (12… Read more

  • SCHEDULED POWER INTERRUPTION SA PEBRERO 1-5, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang CONCEPCION amo ang masunod: PETSA KAG ORAS KAG APEKTADO NGA LUGAR PEBRERO 01, 2023 (MIYERKULES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon)•… Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 27, 2023)

    Date: January 27, 2023 Time of interruption: 10:35 AM Time of restoration: 11:50 AM Affected area: Sitio Bungsod, Badiang, Anilao, Iloilo Activity: Replaced rotten pole We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • REQUIREMENTS FOR CHANGE OF NAME (DECEASED MEMBER CONSUMER)

    1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after on the… Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT(REPUBLIC ACT 11361)

    ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution lines. 2. Pagpatindog… Read more

  • ANO ANG MANUAL LOAD DROPPING?

    Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more