• SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA DISYEMBRE 4, 2022 SA ANILAO, BANATE, BAROTAC VIEJO KAG SAN RAFAEL

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa DISYEMBRE 04, 2022 (DOMINGO), 6:00 AM- 6:00 PM (12 ka oras ang kalawigon). Ang apektado nga lugar sang power interruption amo ang masunod: • ANILAO• BANATE• BAROTAC VIEJO• SAN RAFAEL… Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 25, 2022)

    Date: November 25, 2022 Time of interruption: 7:15 PM Time of Restoration: 7:48 PM Cause of interruption: Damage jumper and secondary bushing. Affected areas: Portion of Brgy.Villa Pani-an, Estancia We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 25, 2022)

    Date: November 25, 2022 Time of interruption: 11:03 AM Time of Restoration: 11:50 AM Cause of interruption: Installation of private transformer (Bayside) Affected areas: Portion of Brgy. Poblacion, Banate We apologize for the inconvenience. For your information. Read more

  • ILECO III personnel conducted BAPA Meeting in Vista Alegre, Barotac Viejo, Iloilo with 95 attendees on January 27, 2023 (Friday)

    This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs).For your information. Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • REQUIREMENTS FOR CHANGE OF NAME (DECEASED MEMBER CONSUMER)

    1. For Spouse Applicants• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III signedby Punong Barangay• Marriage Contract• Proof of Ownership – (e.g. deed of sale, affidavit ofheirship) (if available)2. For Legal Heirs• Death Certificate of Member-Consumer/ BarangayCertification provided by ILECO III• Notarized Waiver of Rights stating that the othersuccessors are not after on the… Read more

  • ANTI-OBSTRUCTION OF POWER LINES ACT(REPUBLIC ACT 11361)

    ‘An Act Ensuring the Continuous and Uninterrupted Transmission and Distribution of Electricity and Protection of the Integrity and Reliability of Power Lines, and Providing Penalties for Violations Thereof.’ Ginadumili-an ang mga masunod: 1. Pagtanom sang maskin ano nga sahi sang matag-as ukon naga-taas nga mga tanom ukon kahoy sa idalom sang distribution lines. 2. Pagpatindog… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more