• SCHEDULED PREVENTIVE MAINTENANCE SA BANWA SANG ANILAO, BANATE, BAROTAC VIEJO, KAG SAN RAFAEL SA OKTUBRE 20, 2024

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 50 MVA Transformer 2 sa Dingle Substation sa OKTUBRE 20, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga power interruption amo ang masunod: OKTUBRE 20, 2024 (DOMINGO) 6:00 AM- 6:00 PM Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: October 03, 2024 (Thursday) Time of interruption: 6:33 AM Estimated time of restoration: NOTE YET DETERMINED Affected areas: Bulak Sur and Alapasco, Batad, Iloilo Cause: Replacement of poles For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: September 29, 2024 (Sunday) Time of interruption: 9:49 AM Time of restoration: 10:23 AM Affected area: Brgy. Pasig, Juaneza and Aposaga, Sara Cause: Vegetation (Bamboo Tree) on Pole Number 0335 of SF1 Activity: Pole to Pole Inspection of primary line, refusing and clearing of line. For your information. Read more

  • ILECO III DONATED ELECTRIC FANS TO ELEMENTARY SCHOOLS OF SAN DIONISIO, ILOILO

    Through the efforts of Dir. Vincent H. Belita (Board of Director- District III, San Dionisio and Concepcion), ILECO III turned-over twenty four (24) stand fans to all elementary schools in San Dionisio, Iloilo on February 1, 2023 (Wednesday). Engr. Belita also give his message informing the educators of the present power industry set-up. He also Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION- Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION- Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • ENERGY SAVING TIP

    Turn off the lights when not needed. Read more

  • LOVE MONTH NA!

    Do you know someone who deserves some love? Visit the post below on ILECO III Official Facebook Page and follow the instructions: https://www.facebook.com/ILECO3/posts/pfbid02uPeWT17NzDGZHobRFMpKatSpiyn3U7e2PeW8iDgJKcgKR6ePaaToXUCL6AaWwqhWl Step 1. Share with us below the picture of your loved one/s.Step 2. Tag/mention him/her and tell us one special thing about him/her.Step 3. Use the #ILECO3ISLOVE in your caption for your entry to Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more