• EMERGENCY POWER INTERRUPTION (NOVEMBER 1, 2022)

    Date: November 1, 2022 Time of interruption: 8:12 AM Time of Restoration: 8:42 AM Affected Area: Whole Feeder 1 of Sara Substation (Brgys of Sara and San Dionisio) Afftected Areas: Sara Substation (Feeder 1)Sara: Aldeguer and Castor (Portion)San Dionisio: Dugman, Tuble, San Nicolas, Cudionan, Had. Conchita, Sua, Tiabas, Cubay, Bagacay, Agdaliran, Borongon, Manduawak, Talo-ato, Batuan,… Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 31, 2022)

    Date: October 31, 2022 Time of interruption: 8:55 PM Time of Restoration: 9:15 PM Affected Area: NHA Village, Magdalo, Banate Reason/Activity: Line fault due to damage of secondary bushing/ Inspection and repaired damaged secondary bushing. We apologize for the inconvenience. For your information. Read more

  • TROUBLESHOOTING OF FEEDER 1 LINE FAULT SUSPENSION INSULATR CENTER PHASE C8 IN DEVERA, SARA

    ILECO III Technical personnel troubleshoot Feeder 1 line fault suspension insulator center phase C8 at Brgy. Devera, Sara, today October 31, 2022 (Monday). Keep safe Warriors of Light For your information. Read more

  • ENERGY SAVING TIP

    Stay up to date on maintenance to save energy. Read more

  • HOW TO USE GCash APP TO PAY ILECO III BILLS

    IMPORTANT REMINDERS 1. Payments thru GCash are only accepted ON or BEFORE due date indicated on the right portion of your statement of account. 2. Check all the provided details prior to payment of bills. 3. Past due bills and partial payments will not be posted. Please settle your accounts to the nearest ILECO III… Read more

  • ILECO III personnel conducted BAPA Meeting in Sitio Nipa, Bay-ang, Ajuy, Iloilo with 58 attendees on February 03, 2023 (Friday)

    This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more

  • HOW TO USE PayMaya APP TO PAY ILECO III BILLS

    IMPORTANT REMINDERS 1. Payments thru PayMaya are only accepted ON or BEFORE due date indicated on the right portion of your statement of account. 2. Check all the provided details prior to payment of bills. 3. Past due bills and partial payments will not be posted. Please settle your accounts to the nearest ILECO III… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more