• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2022)

    Date: November 9, 2022 Time of interruption: 6:40 PM Time of Restoration: 7:45 PM Affected Area: Villahermosa, Sara, Cabantohan, Dapdapan, Omio, Marapal, Alcantara, Yawyawan, Layog Bato and Sitio Talaytay, Poblacion, Lemery Activity: Duplex wire contacted primary line due to vehicular incident in Brgy. Arante, Sara We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2022)

    Date: November 9, 2022 Time of interruption: 10:30 AM Time of Restoration: 4:00 PM Affected Area: Apologista, Sara Activity: Installation of additional 25kVA distribution transformer due to low voltage. We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 12, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 12, 2022 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-construct sang Three Phase Line kag pag-insert sang mga poste. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang SAN DIONISIO… Read more

  • Presyo sang kuryente sang ILECO III padayon nga manubo subong nga Pebrero 2023

    Ang rate subong nga bulan sang Pebrero 2023 ang mas nagnubo pa gid sang 0.65/kwhr kumpara sang Enero 2023. NOBYEMBRE 2022 – 14.6963 pesos/kwhrDISYEMBRE 2022- 13.5551 pesos/kwhrENERO 2023 – 12.6897 pesos/kwhrPEBRERO 2023- 12.0333 pesos/kwhr Sa aton pinalangga nga mga Member-Consumer-Owners, ini ang kabahin sa pagtinguha sang ILECO III para maghatag sang maayo nga serbisyo sa… Read more

  • SYSTEM LOSS SANG ILECO III NAGAPABILIN NGA PINAKAMANUBO SA TANAN NGA ELECTRIC DISTRIBUTION UTILITIES SA REGION 6

    Sa bulan sang Enero 2023, ang ILECO III may ara sang pinakanubo nga system loss nga 3.30% sa bilog nga Western Visayas. Ini mas manubo sa National Ceiling Standard sang Energy Regulatory Commission (ERC) nga indi magsobra sa 10.25% nga gina-pass-on sa mga miyembro konsumidores. Ang pagnubo sang aton system loss ang resulta sang padayon… Read more

  • ACCREDITED THIRD PARTY COLLECTION CENTERS

    Ang tanan nga individual consumers ang pwede makabayad sa mga masunod nga accredited payment centers:PAYMAYAECPAYLINK.BIZPORTALUNION BANKSEVEN ELEVENFIRST CONSOLIDATED BANK- ESTANCIA BRANCHGCASHBDO NETWORK BANK- ESTANCIA AND SARA BRANCHRD PAWNSHOPM LHUILLIERUNIFIED GPRSPALAWAN PAWNSHOPRURAL BANK OF ANILAO, INC.BDO UNIBANKRCBC Samtang ang tanan nga BAPA Members ang kinahanglan nga magbayad sa inyo natungdan nga BAPA. Madamo gid nga salamat. Read more

  • UNDERSTANDING THE POWER BILL AND RATE COMPOSITION

    Ang tanan nga rate sang isa ka Electric Cooperative (EC) gina-approve sang Energy Regulatory Commission (ERC) bag-o ini paga-sukton sa mga konsumidor. Ano bala ang ka-undan sang aton mga power bill kag diin ini nagakadto? GENERATION SYSTEM CHARGE Ini ang ginasukot sang mga Electric Cooperatives para bayaran ang ginakuha nga kuryente halin sa mga power… Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more