• KANSELADO ANG SCHEDULED PREVENTIVE MAINTENANCE SANG NGCP SA MARSO 26, 2023

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa MARSO 26, 2023 (DOMINGO), 6:00 AM- 6:00 PM (12 ka oras ang kalawigon). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: MARSO 26, 2023… Read more

  • EMERGENCY POWER INTERRUPTION (MARCH 23, 2023)

    Date: March 23, 2023 (Thursday)Time of interruption: 12:00 NNEstimated time of restoration: 1:00 PMDuration: 1 hour Affected areas: AJUY AND CONCEPCION Activity: Refilling of SF6 gas of power circuit breaker in Concepcion Switchyard We apologize for the inconvenience. For your information.  Read more

  • UNSCHEDULED POWER INTERRUPTION (MARCH 18, 2023)

    Date: March 18, 2023 (Saturday) Time of interruption: 6:40 P.M. Time of restoration: To be determined Affected area: Brgys. Bobon,Managopaya, and Juanico, Banate Reason: 3 toppled poles hit by backhoe in Brgy. Managopaya, Banate We apologize for the inconvenience. For your information Read more

  • ASH WEDNESDAY

    ILOILO III ELECTRIC COOPERATIVE, INC. observe Ash Wednesday, February 22, 2023. “For you are dust, and to dust you will return.” – Genesis 3:19 Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro… Read more

  • ENERGY SAVING TIP

    Use LED lights. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more