• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 7, 2023)

    Date: November 7, 2023 (Tuesday) Time of interruption: 5:08 AM Estimated time of restoration: 5:39 AM Affected areas: Inventor All Barangays of Municipality of Lemery and Portion of Sara (Arante, Apelo and Villahermosa) Activity: Inspection of primary line then pulled out duplex wire interfering primary line at Brgy. Velasco, Lemery and replaced busted fuse link. Read more

  • EMERGENCY POWER INTERRUPTION SA NOBYEMBRE 8, 2023

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 8, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag relocate sang poste nga apektado sang DPWH widening project. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang SARA amo ang masunod:• Ardemil• Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 6, 2023)

    Date: November 6, 2023 (Monday) Time of interruption: 6:01 PM Estimated time of restoration: 6:33 PM Affected areas: Inventor St., Poblacion, Estancia Activity: Inspection and repaired secondary jumper loose connection of private transformer. We apologize for the inconvenience. For your information. https://www.facebook.com/watch/?v=1048619722843125 Read more

  • ASH WEDNESDAY

    ILOILO III ELECTRIC COOPERATIVE, INC. observe Ash Wednesday, February 22, 2023. “For you are dust, and to dust you will return.” – Genesis 3:19 Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro Read more

  • ENERGY SAVING TIP

    Use LED lights. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more