• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 11, 2023)

    Date: November 11, 2023 (Saturday) Time of interruption: 6:23 p.m. Estimated time of restoration: 11:00 p.m. Affected area/s: Municipalities of Balasan and Carles, and portion of Estancia Cause of power interruption: Line fault in primary distribution line Our maintenance team is currently troubleshooting the damaged primary distribution line for the power to be restored. We Read more

  • SCHEDULED POWER INTERRUPTION SA NOBYEMBRE 15, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa NOBYEMBRE 15, 2023 (MIYERKULES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag relocate sang Single-Phase Line sa Brgy. Pasayan, Batad. Ang lugar nga apektado sang sini nga power interruption amo ang Brgy. Pasayan, Batad. Madamo gid nga salamat Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 9, 2023)

    Date: November 9, 2023 (Thursday) Time of interruption: 7:12 PM Estimated time of restoration: 7:35 PM Affected area/s: Sitio Waling-Waling, Poblacion and Brgy. Barosbos, Carles Activity: Inspection and replaced busted fuse link of Phase C Line. We apologize for the inconvenience. For your information. Read more

  • ASH WEDNESDAY

    ILOILO III ELECTRIC COOPERATIVE, INC. observe Ash Wednesday, February 22, 2023. “For you are dust, and to dust you will return.” – Genesis 3:19 Read more

  • ENERGY SAVING TIP

    Use natural light when possible. Read more

  • ILECO III ENERGY SAVING TIPS

    1. Pag-kontrol sang konsumo sang kuryente.2. Pag-gamit sang highly resistive appliances sa tion sang off-peak (kung sa diin barato ang kuryente) ka-angay sang oven, heater, plantsa kag toasters. Likawan ang pag-gamit sang sini nga mga appliances kung peak hours humalin 6:00 PM tubtob 10:00 PM.3. Patyon ang suga sa kwarto kung wala sang tawo.4. Pagsiguro Read more

  • ENERGY SAVING TIP

    Use LED lights. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more