
POWER RATES
POWER ADVISORIES
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substation of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM The following substations are still UNENERGIZED as of reporting Read more
NEWS AND UPDATES
The turn-over ceremony and signing of Deed of Donation and Acceptance for Classroom Re-Wiring Program were conducted on February 28, 2023 (Tuesday) in Ilaya Elementary School, Poblacion Ilaya, Sara, Iloilo. It was attended by our General Manager Atty. James G. Balsomo II, Dir. Vicente R. Espinosa, Board of Director-District VI (Ajuy), ILECO III employees, Barangay Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ILECO3onFirePreventionMonthCelebration#SaPagIwasSaSunogHindiKaNagIisa Read more
https://www.facebook.com/watch/?v=884235392684016 Read more
1. Avoid overloading outlets.2. Switch off appliances when not in use.3. Keep flammable items away from children.4. Never leave your kitchen unattended while cooking.5. Dispose cigarette butts properly.6. Always check your LPG tanks for leaks.7. Keep lit candles away from flammable materials.8. Regular check electrical wires for damage. Replace it immediately.9. Avoid overnight charging.10. Keep Read more
BIDS AND NOTICES
Rehabilitation and Improvement of Pani-an Area Office Read more
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditure Projects Read more
Procurement of Materials for Maintenance, Rehabilitation, Revamp of Lines and Capital Expenditure Projects Read more