• UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022 Time of interruption: 3:50 PM Time of Restoration: 4:20 PM Cause of interruption: Line fault due to lightning surge, gusty wind and heavy rain. Affected areas: Seaside Gasoline Station, Estancia (Private Transformer) We apologize for the inconvenience. For your information. Read more

  • Update on Unscheduled Power Interruption on Sara Feeder 1

    Time Restored: 7:18 PM Cause of Interruption: Line fault due to vegetation (Coconut Tree was leaning on our Primary Line located at Brgy. Devera, Sara. Thank you for your understanding. Read more

  • UNSCHEDULED POWER INTERRUPTION (NOVEMBER 16, 2022)

    Date: November 16, 2022Time of interruption: 4:47 PMTime of Restoration: NOT YET DETERMINED Cause of interruption: Line fault due to bad weatherAffected areas:SAN DIONISIO – All barangaysSARA (portion)CONCEPCION- Aglosong Our Maintenance Team is currently conducting inspection of lines. We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Keep flammable items away from children. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG BANATE SA MARSO 8-11, 13-18 KAG 20, 2023

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BANATE amo ang masunod: MARSO 08, 2023 (MIYERKULES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Bariga• Hacienda Albina, Dela Paz• Managopaya… Read more

  • FIRE SAFETY TIP

    Switch off appliances when not in use. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • Look: Here are the Winners of #ILECO3IsLove Valentines Contest as they claimed their prize on their winning piece

    In behalf of the Board of Directors, The Management and Staffs of ILECO 3, We congratulate you all for your effort and love you have shown on your love ones! Hope to see you again soon on our next contest. Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more