• UNSCHEDULED POWER INTERRUPTION (April 1, 2022)

    STATUS: RESTOREDDate: April 01, 2022 (Friday)Time of interruption: 12:41 PMTIME OF RESTORATION: 2:48 PMAffected areas: ALL BARANGAYS IN LEMERYSARA – Apelo and Villahermosa onlyCause of power outage: Line fault due to obstruction of Telco Lines We apologized for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (April 1, 2022)

    Date: April 01, 2022 (Friday)Time of interruption: 12:41 PMTIME OF RESTORATION: NOT YET DETERMINED Affected areas: ALL BARANGAYS IN LEMERYSARA – Apelo and Villahermosa only Cause of power outage: Under investigation Our technical team is currently conducting troubleshooting to restore power. Please bear with us during the duration of power restoration activities. We apologized for… Read more

  • EMERGENCY POWER INTERRUPTION SUBONG NGA ADLAW (ABRIL 1, 2022)

    Pahibalo sa mga katapo-konsumidores nga may EMERGENCY POWER INTERRUPTION ang ILECO III subong nga adlaw, ABRIL 01, 2022 (BIYERNES), 12:00 NN- 1:00 PM (isa ka oras ang kalawigon) para sa pagkay-o sang primary jumper sa Brgy. Anoring, Sara, Iloilo. Ang lugar nga apektado sang sini nga power interruption sa San Dionisio, Sara kag Concepcion amo… Read more

  • FIRE SAFETY TIP

    Dispose cigarette butts properly. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • LOOK: ILECO III ATTENDED ABC MEETING IN CARLES, ILOILO

    ILECO III officers appeared to ABC Meeting in Carles headed by MSD Chief, Alex A. Demandante held at Liga Office on March 06, 2023. The said appearance intends to empower the Punong Barangays on the said municipality and at the same time encourage them to be participative in all coops activities. This is also one… Read more

  • FIRE SAFETY TIP

    ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Keep flammable items away from children. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more