• MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA MARSO 3, 2024

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more

  • POWER ADVISORY

    Pahibalo sa mga katapo-konsumidores nga ang SCHEDULED POWER INTERRUPTION sang ILECO III sa PEBRERO 29, 2024 (HUWEBES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) ang KANSELADO. Apang madayon ang scheduled power interruption sa MARSO 06, 2024 (MIYERKULES). Ang apektado sang sini nga power interruption sa banwa sang BANATE amo ang: • LIBERTAD Madamo Read more

  • MAY EMERGENCY POWER INTERRUPTION ANG NGCP SA PEBRERO 27, 2024

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may EMERGENCY POWER INTERRUPTION ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69kV Concepcion-Estancia Transmission Line sa PEBRERO 27, 2024 (MARTES), 1:00 AM- 2:00 AM (1 ka oras ang kalawigon) para sa pag-adjust sang Feeder Protection relay. Ang oras kag apektado nga lugar sang sini Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR FOR SITIO ELECTRIFICATION PROGRAM (SEP) RECIPIENTS IN SITIO ULANG, SAN FLORENTINO, SAN RAFAEL, ILOILO

    Amidst the hot and humid weather, ILECO III personnel successfully conducted the on-site seminar for beneficiaries of Sitio Electrification Program (SEP) Sitio Ulang, San Florentino, San Rafael, Iloilo on March 13, 2023 (Monday). The aforementioned seminar intends to inform the recipients of the basic requirements for the application of electric service connection and likewise the Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more