• SCHEDULED POWER INTERRUPTION SA BANWA SANG BAROTAC VIEJO SA HULYO 10, 11, KAG 12

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-clearing sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang BAROTAC VIEJO amo ang masunod: HULYO 10, 2024 (MIYERKULES) 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) • Bangga 13, Natividad HULYO Read more

  • SCHEDULED POWER INTERRUPTION SA BANWA SANG AJUY SA HULYO 5, 2024

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa HULYO 05, 2024 (BIYERNES), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-relocate sang poste. Ang lugar nga apektado sang sini nga power interruption sa banwa sang AJUY amo ang: • Pinantan Elizalde Madamo gid nga salamat sa inyo Read more

  • UNSCHEDULED POWER INTERRUPTION

    Date: June 29, 2024 (Saturday) Time of power interruption: 11:54 a.m. Time of power restoration: 12:29 p.m. Affected areas: Feeder 3 of Daan Banwa Substation (municipality of Batad and portion of Estancia) Cause of power interruption: Fallen mahogany tree on the 3-phase power line at Proper 2, Brgy. Lumbia, Estancia. Residents/consumers who plan to cut Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR FOR SITIO ELECTRIFICATION PROGRAM (SEP) RECIPIENTS IN SITIO ULANG, SAN FLORENTINO, SAN RAFAEL, ILOILO

    Amidst the hot and humid weather, ILECO III personnel successfully conducted the on-site seminar for beneficiaries of Sitio Electrification Program (SEP) Sitio Ulang, San Florentino, San Rafael, Iloilo on March 13, 2023 (Monday). The aforementioned seminar intends to inform the recipients of the basic requirements for the application of electric service connection and likewise the Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more