• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 5:54 PM Time of Restoration: 6:46 PM Affected Area: Tupas St., Poblacion, Barotac Viejo Activity: Repair secondary inner jumper cut-off We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 4:53 PM Time of Restoration: 5:30 PM Affected Area: Cabilao Grande and Sitio Camendez, Bancal, Carles (BAPA) Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 12:50 PM Time of Restoration: 2:00 PM Affected Area: Crossing Alfe, Guinticgan, Carles Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more