• UNSCHEDULED POWER INTERRUPTION (APRIL 25, 2022)

    Date: April 25, 2022 (Monday) Time of interruption: 8:22 PM Time of restoration: 8:44 PM Affected area: Bayuyan and San Roque, Estancia, Iloilo Activities: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • VOLTAGE CORRECTION OF ABONG ICE PLANT

    ILECO III Technical Team conducted voltage correction of Abong Ice Plant on April 25, 2022 (Monday). For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (APRIL 25, 2022)

    Date: April 25, 2022 (Monday) Time of interruption: 9:32 AM Time of restoration: 10:05 AM Affected area: Sitio Punta, Lawis, Balasan Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more