• UNSCHEDULED POWER INTERRUPTION (MAY 11, 2022)

    Date: May 11, 2022 (Wednesday) Time of interruption: 11:56 AM Time of restoration: 12:48 PM Affected areas: Dela Peña and Lipata, Barotac Viejo, Iloilo Activity: Replaced damaged/burned pin type porcelain insulator We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (MAY 11, 2022)

    Date: May 11, 2022 (Wednesday) Time of interruption: 9:25 AM Time of restoration: 2:40 PM Affected area: Poblacion North East Zone, Lemery, Iloilo Activity: Replaced two (2) rotten poles We apologize for the inconvenience. For your information. Read more

  • EMERGENCY POWER INTERRUPTION (MAY 11, 2022)

    Date: May 11, 2022 (Wednesday) Time of interruption: 1:15 AM Estimated time of restoration: 2:00 PM Affected areas: All barangay of San Rafael, Iloilo Activity: Replacement of toppled pole We apologize for the inconvenience. For your information. Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more