• INSTALLATION OF SMART METER

    ILECO III Technical Team installed smart meter of two (2) big loads in our franchise coverage area today, September 01, 2022 (Thursday). Keep safe Warriors of Light! For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA SETYEMBRE 5-7 KAG 9, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-relocate kag pag-ilis sang mga guba nga poste sa Ajuy. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions sa banwa sang Ajuy amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGAR SETYEMBRE 06, 2022 (MARTES)9:00 AM- 5:00… Read more

  • PREVENTIVE MAINTENANE ACTIVITY SA NATIVIDAD AREA COVERAGE

    ILECO III Technical Team nagapatigayon sang Preventive Maintenance Activity sa Natividad Area Coverage subong nga adlaw, Agosto 29, 2022 (Lunes). Ang apektado nga lugar amo ang masunod:-Tanan nga barangay sa Anilao-Tanan nga barangay sa Banate-Tanan nga barangay sa Barotac Viejo-Tanan nga barangay sa San Rafael Keep safe Warriors of Light. Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more