• UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 7:30 AM Time of power restoration: 9:21 AM Affected areas: Purok 1, Tarong, Carles Activity: Inspection and clearing of line due to vegetation For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 7:45 AM Time of power restoration: 10:28 AM Affected areas: Sitio Nangka, Bancal, Carles Activity: Inspection of line and replaced busted fuse link For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 7:15 AM Time of power restoration: 8:28 AM Affected areas: Purok 5, Mamhut Sur, Balasan Activity: Inspection of secondary line and replaced busted fuselink. For your information. Read more

  • FIRE SAFETY TIP

    Ensure emergency contact information is up to date. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • BEAT THE HEAT!

    – Wear comfortable clothes.– Make use of fans or air-conditioners set to cool.– Drink plenty of water regularly.– Use sunscreen protections.– Take a shower. A friendly reminders from ILECO III. Read more

  • FIRE SAFETY TIP

    Remove potential fire hazards. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • LOOK: ILECO III CONDUCTED ON-SITE PRE-MEMBERSHIP SEMINAR FOR SITIO ELECTRIFICATION PROGRAM (SEP) RECIPIENTS IN SITIO ULANG, SAN FLORENTINO, SAN RAFAEL, ILOILO

    Amidst the hot and humid weather, ILECO III personnel successfully conducted the on-site seminar for beneficiaries of Sitio Electrification Program (SEP) Sitio Ulang, San Florentino, San Rafael, Iloilo on March 13, 2023 (Monday). The aforementioned seminar intends to inform the recipients of the basic requirements for the application of electric service connection and likewise the Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more