• CLEARING OF LINES DUE TO VEGETATION IN SITIO BANGON BANGON, RIZAL, BAROTAC VIEJO

    ILECO III Technical personnel conducted clearing of lines due to vegetation at Sitio Bangon2x, Rizal, Barotac Viejo today, October 11, 2022 (Tuesday). No power interruption occurred. Keep safe Warriors of Light For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 11, 2022)

    Date: October 11, 2022 Time of interruption: 3:19 PM Time of Restoration: 5:31 PM Affected Area: Poscolon, San Rafael Reason/Activity: Transient line fault. Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (OCTOBER 11, 2022)

    Date: October 11, 2022 Time of interruption: 10:09 AM Time of Restoration: 2:34 PM Affected Area: Sitio Kawayan Sulod, Kawayan, Carles Reason/Activity: Inserting and replacement of rotten pole and changing of kWhr Meter We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • PRE-MEMBERSHIP SEMINAR FOR SEP RECIPIENTS OF BARANGAY NAGSULANG, LEMERY

    ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more