• UNSCHEDULED POWER INTERRUPTION (AUGUST 20, 2023)

    Date: August 20, 2023 (Sunday) Time of interruption: 8:10 PM Time of restoration: 9:36 PM Affected areas: Santiago, Barotac Viejo Action Taken: Inspection of line and repaired busted fuselink due to heavy rian and lightning surge. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 20, 2023)

    Date: August 20, 2023 (Sunday) Time of interruption: 5:25 PM Time of restoration: 5:50 PM Affected areas: San Juan, Barotac Viejo Action Taken: Inspection of line and repaired neutral wire cut-off due to sparking of SDI. We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 20, 2023)

    Date: August 20, 2023 (Sunday) Time of interruption: 1:26 PM Time of restoration: 1:43 PM Affected areas: Gaisano Mall, Poblacion, Estancia Action Taken: Inspection of line and repaired busted fuselink We apologize for the inconvenience. For your information. Read more

  • FIRE SAFETY TIP

    Install smoke detention alarm. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.” #ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • FIRE SAFETY TIP

    Review your Fire Evacuation Plan. ILOILO III ELECTRIC COOPERATIVE, INC. joins everyone in observing the FIRE PREVENTION MONTH, March 1-31, 2023 with the theme: “Sa Pag-iwas sa Sunog,Hindi Ka Nag-iisa.”#ileco3onfirepreventionmonthcelebration#sapagiwassasunoghindikanagiisa Read more

  • PRE-MEMBERSHIP SEMINAR FOR SEP RECIPIENTS OF BARANGAY NAGSULANG, LEMERY

    ILECO 3 Officers successfully conducted the Pre-Membership Seminar (PMS) for Sitio Electrification Program (SEP) recipients held at ILECO 3 Headquarter Site, Preciosa, Sara on March 15, 2023 (Wednesday). The above-mentioned seminar was attended by beneficiaries from barangay Nagsulang, Lemery and respectively in barangay Domingo, Sara. The requirements needed for application and subsidies granted to them… Read more

  • NOTICE TO THE PUBLIC

    Ginapahibalo ang tanan nga mga katapo-konsumidores nga SUGOD SUBONG NGA MARSO 2023 BILLING, ang GRACE PERIOD nga ginapatuman sang opisina ang maga-balik sa orihinal nga LIMA (5) KA ADLAW PAGKATAPOS SANG NAKA-SAAD NGA DUE DATE SA ATON NGA BILL. Gani sa liwat, nagapahanumdum gid ang aton kooperatiba nga magbayad sang aton bill antes ukon sa… Read more

  • ITB 2201, S. 2022

    15MVA Banate Substation 69KV Structure for Tapping Point and 13.2 kV Double Circuit Distribution Lines (Turn Key Project) Read more

  • ITB 2014, S. 2021

    Procurement of Materials and Equipment for Change Meter/Rehabilitation, ServiceDrop Installation, Housewiring Loan, and Maintenance Use Read more

  • ITB 2012, S. 2021

    Procurement of Boom Truck Read more