
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila 69kV Concepcion-Estancia Transmission Line sa PEBRERO 10, 2024 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: 6:00 AM- 7:00 AM (1 ka oras ang kalawigon)KAG5:00 PM- 6:00 Read more
Date: February 03, 2024 (Saturday)Time of interruption: 12:00 NNEstimated time of restoration: Within one (1) hour Affected area: Feeder 1 of Ajuy Substation Ajuy S/s Feeder 1 *CONCEPCIONAgnagaBacjawan Norte (Portion)Bacjawan SurBatitiCalamigan (Portion)Jamul-awonLo-ongMacalbangNinoNipaPlandicoPoblacionTamis-ac *AJUYBucana BunglasRojasPuente BunglasSilagonLanjagan (Portion)Pantalan Navarro Activity: To trouble shoot 69kV circuit breaker We apologize for the inconvenience. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa PEBRERO 03, 2024 (SABADO), 8:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa patigayunon nga technical activities. Ang lugar nga apektado sang sini nga power interruptions sa banwa sang BALASAN amo ang masunod:• Bacolod• Batuan• Cabalic• Dolores• Gimamanay• Malapoc• Poblacion Read more
NEWS AND UPDATES
This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed Read more
System loss is one of the burdens of Electric Cooperatives all over the country, if not controlled and monitored, it is sometimes the reason why higher rates/charges are being added to power bills of Member-Consumer-Owners (MCOs) . Relative to this, The Iloilo III Electric Cooperative Inc. (ILECO III) in coordination with Sara Area Office led Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior Read more
The bravery of Ilonggos are very much seen in today’s generation! #CelebratingLiberationOfPanay#ILECO3strong#ProudIlonggo Read more
BIDS AND NOTICES
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more
Procurement of Poles Read more