
POWER RATES
POWER ADVISORIES
Date: October 5, 2022 Time of interruption: 10:30 AM Time of Restoration: 12:00 NN Affected Area: Portion of Brgy. Pedada, Ajuy Activity: Replacement of rotten leap pole Nine (9) kWhr Meter We apologize for the inconvenience. For your information. Read more
Pahibalo sa mga katapo-konsumidores nga may patigayunon nga SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Dingle-Natividad 69kV Line sa OKTUBRE 15, 2022 (SABADO), 6:00 AM- 6:00 PM (12 ka oras ang kalawigon). Ang apektado nga lugar sang power interruption amo ang masunod: • ANILAO• BANATE• BAROTAC VIEJO• SAN RAFAEL… Read more
Date: October 3, 2022 Time of interruption: 7:08 PM Time of Restoration: 7:40 PM Affected Area: Brgy. Camambugan and Salong, Balasan Activity: Inspection of line and replaced busted fuselink We apologize for the inconvenience. For your information. Read more
NEWS AND UPDATES
ILOILO III ELECTRIC COOPERATIVE, INC. joins the biggest hour for Earth. EARTH HOUR! Let’s switch off later 8:30 PM – 9:30 PM, this will help Earth recover for our future. Read more
This meeting was conducted to inform the members of the status of BAPA operation as well as the important matters concerning our Cooperative. This information education campaign (IEC) is part of ILECO III’s empowerment program of our member-consumer-owners (MCOs). This activity is made possible with the support of ILECO III BODs and Management Committee headed… Read more
System loss is one of the burdens of Electric Cooperatives all over the country, if not controlled and monitored, it is sometimes the reason why higher rates/charges are being added to power bills of Member-Consumer-Owners (MCOs) . Relative to this, The Iloilo III Electric Cooperative Inc. (ILECO III) in coordination with Sara Area Office led… Read more
Pahibalo sa mga katapo konsumidores sang ILECO III nga may ara sang 5% nga diskwento para sa aton mga Senior Citizens nga naga-konsumo sang indi maglapaw sa 100 kwhr kag nakapa-miyembro na sa kooperatiba indi magnubo sa isa ka tuig.Ipasa ang mga masunod nga requirements sa pinakamalapit nga Area Office sang ILECO III:• Valid Senior… Read more
BIDS AND NOTICES
Procurement of 4X4 Pick Up Vehicle for Area Offices and Utility Van for Main Office Read more
Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Loan, and Maintenance Use Read more