• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 15, 2022)

    Date: September 15, 2022 Time of interruption: 8:00 AM Time of Restoration: 9:40 AM Affected Area: Sitio Daga Bagacay, San Dionisio, San Rafael Activity: Inspection of line and replaced fuselink due to animal contact (bat) We apologize for the inconvenience. For your information. Read more

  • SCHEDULED POWER INTERRUPTION SA SETYEMBRE 19, 29 KAG 30, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa pag-ilis sang poste, pag-convert kag pag-construct sang linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: PETSA KAG ORAS APEKTADO NGA LUGARSETYEMBRE 19, 2022 (LUNES)8:00 AM- 5:00 PM (9 ka oras ang kalawigon) •… Read more

  • SCHEDULED POWER INTERRUPTIONS SA SETYEMBRE 17, 19 KAG 20, 2022

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III para sa patigayunon nga pag-clearing sang mga linya. Ang petsa, oras kag lugar nga apektado sang sini nga power interruptions amo ang masunod: SETYEMBRE 17, 2022 (SABADO)8:00 AM- 4:00 PM(8 ka oras ang kalawigon)• Sitio Lo-ong Bukid, Lo-ong, Concepcion SETYEMBRE 19, 2022 (LUNES)8:00… Read more

  • LOOK: ILECO III PERSONNEL ATTENDED SB SESSION IN CARLES, ILOILO

    In order to continuously strengthen our robust partnership with our allies in the field of Rural Electrification, the employees from ILECO 3 headed by Alex A. Demandante, MSD Chief attended the SB Session in Carles held at the SB Session Hall on March 28, 2023(Tuesday). The said appearance aims to inform the Sanguniang Bayan Members… Read more

  • BAPA AREA MEETING AND METER READER SKILLS ENHANCEMENT SEMINAR

    ILECO III conducts BAPA Meter Reader Enhancement Seminar/BAPA Chairmen Meeting at Natividad Covered Gym on March 23, 2023 (Thursday). It was attended by 31 meter readers and 81 Chairmen within Natividad Area Coverage (Anilao, Banate, Barotac Viejo and San Rafael). The said seminar is a venue for the upgrading of skills of the BAPA meter… Read more

  • “BOLA PARA SA PAG-ASA” – A CORPORATE SOCIAL RESPONSIBILITY CONDUCTED AT BRGY. DEVERA, SARA

    As part of the cooperative’s wellness program, ILECO III conducted a Corporate Social Responsibility dubbed, “BOLA PARA SA PAG-ASA” that aims to foster harmonious relationship and strong bond with our valued MCOs, partner organizations and other stakeholders. The Friendship Basketball Game was organized between ILECO III Warriors and Brgy. Devera Basketball Team in Brgy. Devera,… Read more

  • LOOK: ILECO III CONDUCTED FIRE PREVENTION LECTURE AND DRILL

    In line with Fire Prevention Month with a theme “Sa Pag-Iwas sa Sunog, Hindi ka Nag-Iisa”, ILECO III conducted a Fire Prevention Lecture and Drill on March 22, 2023. As part of our efforts in ensuring the cooperative’s safety as well as to raise awareness of our employees on fire hazards in the workplace including… Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more