• UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 5:54 PM Time of Restoration: 6:46 PM Affected Area: Tupas St., Poblacion, Barotac Viejo Activity: Repair secondary inner jumper cut-off We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 4:53 PM Time of Restoration: 5:30 PM Affected Area: Cabilao Grande and Sitio Camendez, Bancal, Carles (BAPA) Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (SEPTEMBER 7, 2022)

    Date: September 7, 2022 Time of interruption: 12:50 PM Time of Restoration: 2:00 PM Affected Area: Crossing Alfe, Guinticgan, Carles Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. Read more

  • GOOD FRIDAY

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Good Friday, April 07, 2023 Read more

  • MAUNDY THURSDAY

    ILOILO III ELECTRIC COOPERATIVE, INC. observes Maundy Thursday, April 06, 2023 Read more

  • MAGPAREHISTRO NA SA ATON 31ST AGMA

    ILOILO III ELECTRIC COOPERATIVE, INC. 31st VIRTUAL ANNUAL GENERAL MEMBERSHIP ASSEMBLY Link for Registration: https://forms.gle/1xEEg6uTxFaCxmhk9 https://forms.gle/aexZrv4zhbcBSn4X8 https://forms.gle/Wa8JXiYagacCoBcm6 Read more

  • ILECO 3 HOLY WEEK SCHEDULE

    PAHIBALO SA MGA KATAPU-KONSUMIDORES ILECO 3 Holy Week Schedule Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more