
POWER RATES
POWER ADVISORIES
Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila sa ila 50 MVA Transformer #1 sa Panit-an Substation sa MARSO 03, 2024 (DOMINGO). Ang oras kag apektado nga lugar sang sini nga CANCELLED power interruption amo ang masunod: 5:00 AM- 7:00 AM (2 ka Read more
As of 12:30 AM, March 2, 2024 Power was FULLY RESTORED in the entire coverage area of ILECO III. Ajuy S/s Time of Interruption: 6:54 PM, March 1, 2024 Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Time of Interruption: 7:05 PM, March 1, 2024 Feeder 1 – Read more
With the LIMITED POWER supplied by the National Grid Corporation of the Philippines (NGCP) to the grid, power was restored to the areas catered by the following substations of ILECO III: Ajuy S/s Feeder 1 – ENERGIZED at 9:52 PM Feeder 2- ENERGIZED at 9:53 PM Sara S/s Feeder 1 – ENERGIZED at 11:03 PM Read more
NEWS AND UPDATES
Pahanumdom sa tanan nga Katapu-Kunsomidor sang ILECO III para sa palaabuton nga 31st Virtual Annual General Membership Assembly. Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins with all Muslim Member-Consumer-Owners’ in celebrating Eid al-Fitr, April 21, 2023. Read more
Sa tanan nga mga Member-Consumer-Owners (MCOs) sang ILECO III, pwede na kamo makapa register online para sa pala-abuton nga Virtual 31st AGMA sa Abril 22, 2023 (Sabado), 1:00 PM. MAGPA-REHISTRO KAG MAG-DAUG SANG MGA PAPREMYO! Read more
ILOILO III ELECTRIC COOPERATIVE, INC. joins in the celebration of Annual Municipal Town Fiesta of Batad, Iloilo, April 21, 2023. Happy Fiesta Banwa sang Batad!. Read more
BIDS AND NOTICES
Design and Integration of ILECO III Mobile Application Read more