• ILECO III POWER ADVISORY: EMERGENCY POWER INTERRUPTION

    Date: March 28, 2022 (Monday) Time of interruption: 12:00 NN Time of restoration: 3:00 PM Affected areas:ALL BARANGAYS IN SAN RAFAELBAROTAC VIEJO: BUGNAYCALIFORNIADELA PEÑALA FORTUNALIPATARIZALSAN ANTONIOSAN GERONIMOSAN LUCASSAN MIGUELUGASAN Activity: To replace damaged pole hit by a vehicleWe apologize for the inconvenience. For your information. Read more

  • MAY SCHEDULED PREVENTIVE MAINTENANCE ANG NGCP SA NOBYEMBRE 25, 2023

    Pahibalo sa mga katapo-konsumidores nga may patigayunon nga may SCHEDULED PREVENTIVE MAINTENANCE ang NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP) sa ila Sara 69kV Metering Point sa NOBYEMBRE 25, 2023 (SABADO). Ang oras kag apektado nga lugar sang sini power interruption amo ang masunod: NOBYEMBRE 25, 2023 (SABADO)8:00 AM- 5:00 PM(9 ka oras ang kalawigon)•… Read more

  • POWER RESTORATION IN BRGY. DAPDAPAN, LEMERY

    ILECO III Technical Team restored power in Brgy. Dapdapan, Lemery, Iloilo today, April 13, 2022 (Wednesday).For your information. Read more

  • HAPPY BIRTHDAY VICE GOVERNOR GARIN!

    Happy birthday to Hon. Christine S. Garin, Vice Governor, Province of Iloilo. Wishing you all the best in life and may God bless you always. From ILECO III Family! Christine Tingting Garin Read more

  • 31ST AGMA LIVE FEED

    https://www.facebook.com/watch/live/?ref=watch_permalink&v=756852255897340 Read more

  • MGA DAPAT TANDAAN SA 31ST VIRTUAL AGMA

    Pahanumdom sa tanan nga Katapu-Kunsomidor sang ILECO III para sa palaabuton nga 31st Virtual Annual General Membership Assembly. Read more

  • EID AL-FITR

    ILOILO III ELECTRIC COOPERATIVE, INC. joins with all Muslim Member-Consumer-Owners’ in celebrating Eid al-Fitr, April 21, 2023. Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more