• UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 1:09 PM Time of power restoration: 1:58 PM Affected areas: Sitio Kalubihan, Barosbos, Carles Activity: Inspection of primary and secondary line due to animal contact and replaced busted fuselink. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 10:57 AM Time of power restoration: 12:49 PM Affected areas: Portion of Sua, San Dionisio Activity: Inspection/Clearing of lines and repaired neutral line cut-off For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JANUARY 26, 2024)

    Date: January 26, 2024 Time of interruption: 6:55 AM Time of power restoration: 8:36 AM Affected areas: Pani-an, Balasan Activity: Change of kWhr Meter and replaced busted fuse link For your information. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • SAFETY TIPS SA PANAHON SANG TAG-ULAN

    1. Patyon ang Main Switch kung nagabaha na sa inyo lugar. 2. Indi pagtandugon ang mga basa nga wirings sang kuryente. 3. Indi magsaka sa mga kahoy bangud possible nga maglatay ang boltahe sang kuryente sa mga basa nga sanga. 4. Pagkatapos mabahaan ang inyo lugar, indi anay pagbuksan ang main switch. Magtawag sang accredited Read more

  • ITB 2501, S. 2025

    Read more

  • ITB 2409, S. 2024

    Invitation to Bid for the Supply and Delivery of kWHr Meters, 5(100) A, Electronic, Single Phase, Bottom Connected (6,434 units) Read more

  • ITB 2408, S. 2024

    Invitation to Bid for the Supply, Delivery and Construction of Distribution Lines and Installation of Kwhr Meter, Service Drop Wires and House Wiring Materials in Three (3) Brgys. (Brgy. Buaya, Brgy. Alipata, and Brgy. San Fernando) in Sicogon Island, Carles, Iloilo (Turn Key) Read more