• KANSELADO ANG SCHEDULED POWER INTERRUPTION SA HULYO 29, 2022 SA BANWA SANG CONCEPCION

    Pahibalo sa mga katapo-konsumidores nga KANSELADO ang SCHEDULED POWER INTERRUPTION sang ILECO III sa HULYO 29, 2022 (BIYERNES), 08:00 AM- 5:00 PM (9 ka oras ang kalawigon) para sa pag-convert sang linya halin sa Open Secondary pakadto sa Single Phase Line. Ang lugar nga apektado sang KANSELADO nga power interruption amo ang: • GK VILLAGE,… Read more

  • EMERGENCY POWER INTERRUPTION (JULY 28, 2022)

    Date: July 28, 2022 (Thursday) Time of interruption: 1:00 PMEstimated time of restoration: 4:00 PM Affected area: Sitio Dawis, Poblacion, Ajuy, Iloilo Activity: Replacement of rotten pole and rehab of kwhr meters We apologize for the inconvenience. For your information. Read more

  • UNSCHEDULED POWER INTERRUPTION (JULY 28, 2022)

    Date: July 28, 2022 Time of interruption: 10:59 AM Time of restoration: 11:37 AM Affected area: Lopez Jaena St., Poblacion, Barotac Viejo Activities: Replaced damaged transformer and rehab of sagging duplex wire We apologize for the inconvenience. For your information. Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • ITB 2204, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB, 2203 S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2202, S. 2022

    Procurement of Poles Read more