• SCHEDULED POWER INTERRUPTION SA AGOSOT 26, 2022 SA BANWA SANG ESTANCIA

    Pahibalo sa mga katapo-konsumidores nga may SCHEDULED POWER INTERRUPTION ang ILECO III sa AGOSTO 26, 2022 (BIYERNES), 9:00 AM- 5:00 PM (8 ka oras ang kalawigon) para sa pag-clearing sang linya. Ang lugar nga apektado sang sini nga power interruption sa banwa sang ESTANCIA amo ang masunod:• CALAPDAN• VILLA PATERNA SUBD., CANO-AN Madamo gid nga… Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 21, 2022)

    Date: August 21, 2022 Time of interruption: 2:43 PM Time of Restoration: 3:30 PM Affected Area: Alapasco, Batad Activity: Inspection of line and replaced busted fuse link We apologize for the inconvenience. For your information. https://www.facebook.com/watch/?v=808844556783191 Read more

  • UNSCHEDULED POWER INTERRUPTION (AUGUST 21, 2022)

    Date: August 21, 2022 Time of interruption: 6:18 AM Time of Restoration: 8:10 AM Affected Area: Natividad S/s Feeder 2 (All barangays in Anilao except portion of Dangula-an and Cag-an) Activity: Replace of fuse tube due to loose connection We apologize for the inconvenience. For your information. https://www.facebook.com/watch/?v=457268426300104 Read more

  • ENERGY SAVING TIP

    Switch to energy efficient appliances. Read more

  • DIIN NAGA HALIN ANG ATON KURYENTE?

    GENERATION– Ini ang ginabug-osan sang mga Independent Power Producer ukon IPPs katulad sang (SIPC, GCGI, PEDC kag GMPC) nga nagaproseso sa pag-produser sang kuryente kag diri nakakontrata ang suplay sang kuryente ni ILECO III. TRANSMISSION– Ini ang ginadumala ukon ginamintenar sang National Grid Corporation of the Philippines o (NGCP) nga gina-agyan sang kuryente halin sa… Read more

  • ENERGY SAVING TIP

    Unplug devices when not in use. Read more

  • FREQUENTLY ASKED QUESTIONS

    ANO ANG DAPAT UBRAHON KUNG MAY ARA NGA POWER INTERRUPTION SA AMON LUGAR? Read more

  • ITB 2209, S. 2022

    Procurement of Materials for Construction of Distribution Lines and Supply, Delivery and Installation of Kwhr Meter for Sitio Electrification Program (SEP) – Forty Four (44) Sitios Read more

  • ITB 2208, S. 2022

    Procurement of Materials and Labor for the Extension of Distribution Lines for Five (5) NHA Yolanda Permanent Resettlement Sites (A Turn-Key Project) Read more

  • ITB 2207, S. 2022

    Re-Bidding of the Procurement of Materials and Equipment for Change Meter/Rehabilitation, Service Drop Installation, Housewiring Land and Maintenance Use Read more